![](https://static.wixstatic.com/media/11062b_6a134fc09ea34833a17d295e295ab517f000.jpg/v1/fill/w_1920,h_1080,al_c,q_90,enc_avif,quality_auto/11062b_6a134fc09ea34833a17d295e295ab517f000.jpg)
![pacc-log-removebg-preview.png](https://static.wixstatic.com/media/c69f66_3271e4b47590460ea4d8e51dcc20c7b8~mv2.png/v1/fill/w_536,h_212,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/pacc-log-removebg-preview.png)
![30yrars-1.jpg](https://static.wixstatic.com/media/f8e217_3fecfdb34d104c578372281074e95a4d~mv2.jpg/v1/fill/w_264,h_253,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/30yrars-1.jpg)
30+ years on the road of succsess building right solutions
![unitel-logo-m-removebg-preview.png](https://static.wixstatic.com/media/c69f66_e1e4b6072de64283bbe353c11bd7aa28~mv2.png/v1/fill/w_257,h_159,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/unitel-logo-m-removebg-preview.png)
Pair Gain Systems
-
From 2001 to 2005 PACC installed 452.500 lines of pair gain system over Telecom Egypt
-
Network installation all over Egypt to increase the capacity of Telecom Egypt Network.
-
The prime minister of Egypt attended the opening of the project in Al-Mokattam exchange.
Telephone Networks installations
-
Design, planning and installation of the extension of the telephone network of Rode El-Farag area in Cairo for Telecom Egypt (16000 lines).Design, planning and installation of the extension of the telephone network of Ramasis area in Cairo for Telecom Egypt (12000 lines).
-
Design, planning and installation of the telephone network of 15th of May City in Helwan for Telecom Egypt (17500 lines).
-
Design, planning and installation of the telephone network of New Fostat City in Cairo for Telecom Egypt (13200 lines).
-
Design, planning and installation of the telephone network of Al-Lasselky area, Maadi2, for Telecom Egypt (4800 lines).
-
Design, planning and installation of the telephone network of Bretcho America area, Mokatam, for Telecom Egypt (4000 lines).
-
Design, planning and installation of the telephone network of New Mearag area, for Telecom Egypt (12000 lines).
-
Design, planning and installation of Beverly Hills area in 6th October City for Telecom Egypt.
-
MSAN/MDU
POP Installations -
PACC is responsible for the installation of new POPs of TE Data all over the country.
-
PACC was responsible for the installation of upgrades of already existing POPs of TE Data all over the country.
![]() | ![]() | ![]() |
---|---|---|
![]() |