Pair Gain Systems 

  • From 2001 to 2005 PACC installed 452.500 lines of pair gain system over Telecom Egypt

  • Network installation all over Egypt to increase the capacity of Telecom Egypt Network.

  • The prime minister of Egypt attended the opening of the project in Al-Mokattam exchange.
     

Telephone Networks installations

 

  • Design, planning and installation of the extension of the telephone network of Rode El-Farag area in Cairo for Telecom Egypt (16000 lines).Design, planning and installation of the extension of the telephone network of Ramasis area in Cairo for Telecom Egypt (12000 lines).

  • Design, planning and installation of the telephone network of 15th of May City in Helwan for Telecom Egypt (17500 lines).

  • Design, planning and installation of the telephone network of New Fostat City in Cairo for Telecom Egypt (13200 lines).

  • Design, planning and installation of the telephone network of Al-Lasselky area, Maadi2, for Telecom Egypt (4800 lines).

  • Design, planning and installation of the telephone network of Bretcho America area, Mokatam, for Telecom Egypt (4000 lines).

  • Design, planning and installation of the telephone network of New Mearag area, for Telecom Egypt (12000 lines).

  • Design, planning and installation of Beverly Hills area in 6th October City for Telecom Egypt.

  • MSAN/MDU

    POP Installations

  • PACC is responsible for the installation of new POPs of TE Data all over the country.

  • PACC was responsible for the installation of upgrades of already existing  POPs of TE Data all over the country.